
News from Mexico!
At the beginning of the year, we presented the COOPERATIVE LA CRUZ AZUL project. As a reminder, RBL REI was commissioned to design and supply a belt conveyor system to link the operating limestone quarry to the existing cement work.
Today, the project is progressing well, especially the connection between the two conveyors via a common gantry structure.
In total, no less than 800 tonnes of steel structure were required for the manufacturing.


